FL/DOT: Bridge Replacement (CO 003)
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge
The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, highway signing, guardrail, bridges, temporary bridges, and other incidental construction on CR 361(Keaton Beach Rd) in Taylor County over Spring Warrior Creek.
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Road, Rail, Waste Processing and Treatment, Bridge, Commercial, Manufacturing (Industrial)
- Location
- Perry, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: Bridge Replacement (CO 003)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | notice of completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, highway signing, guardrail, bridges, temporary bridges, and other incidental construction on CR 361(Keaton Beach Rd) in Taylor County over Spring Warrior Creek. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Perry |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Road, Rail, Waste Processing and Treatment, Bridge, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
