FL/DOT: Bridge Replacement (CO 016)
Sector: Commercial • Location: New Smyrna Beach, Florida, United States of America
Source: Dodge USA
The improvements under this contract consist of improvements to Barracuda Blvd. and includes replacement of the Br. No. 795700 and reconstruction of the approach roadway to raise the profile. Additionally, the City has requested realignment of the intersection to the north (Quay Assisi) to eliminate a skew through the intersection.
- Status
- Closed
- Sector
- Commercial, Bridge, Road
- Location
- New Smyrna Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FL/DOT: Bridge Replacement (CO 016)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvements under this contract consist of improvements to Barracuda Blvd. and includes replacement of the Br. No. 795700 and reconstruction of the approach roadway to raise the profile. Additionally, the City has requested realignment of the intersection to the north (Quay Assisi) to eliminate a skew through the intersection. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | New Smyrna Beach |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Road |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
