FL/DOT: Construction for Intersection Along Sr 80 (CO001)
Sector: Manufacturing (Industrial) • Location: Fort Myers, Florida, United States of America
Source: Dodge USA
The improvements under this Contract consist of pedestrian and safety upgrades to include, milling, resurfacing, signing and pavement markings, lighting, signalization, and other incidental construction for intersection improvements along SR 80 from Veronica Shoemaker Blvd. to Kingston Dr. and SR 82 from Ford St. to Veronica Shoemaker Blvd. in Lee County.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Road
- Location
- Fort Myers, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FL/DOT: Construction for Intersection Along Sr 80 (CO001)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvements under this Contract consist of pedestrian and safety upgrades to include, milling, resurfacing, signing and pavement markings, lighting, signalization, and other incidental construction for intersection improvements along SR 80 from Veronica Shoemaker Blvd. to Kingston Dr. and SR 82 from Ford St. to Veronica Shoemaker Blvd. in Lee County. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Fort Myers |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Road |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
