FL/DOT: CR-510/85th Street Improvements
Sector: Manufacturing (Industrial) • Location: Vero Beach, Florida, United States of America
Source: Dodge
The Improvements under this Contract consist of , but are not limited to, roadway, reconstruction, milling resurfacing, widening, concrete (reinforced, sidewalk, driveway, curb and gutter), earthwork, drainage, monitor existing structures (inspection and settlement), lighting, signalization, utility work, signage (single and multi-post), pavement markings (painted, thermoplastic) and sod along CR-
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Transmission, Road, Commercial, Car parking, Cement, Power Generation (CCGT), Waste Processing and Treatment, Automotive
- Location
- Vero Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: CR-510/85th Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Improvements under this Contract consist of , but are not limited to, roadway, reconstruction, milling resurfacing, widening, concrete (reinforced, sidewalk, driveway, curb and gutter), earthwork, drainage, monitor existing structures (inspection and settlement), lighting, signalization, utility work, signage (single and multi-post), pavement markings (painted, thermoplastic) and sod along CR-510/85th Street from CR-512 southerly 0.978 miles to 87th Street in Indian River County. The Stat... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Vero Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Road, Commercial, Car parking, Cement, Power Generation (CCGT), Waste Processing and Treatment, Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
