FL/DOT: SR 10 Road Resurfacing (CO 012)
Sector: Water Supply and Storage • Location: Tallahassee, Florida, United States of America
Source: Dodge
The Improvements under this Contract consist of 403942-3-52-01: Milling & Resurfacing, Minor Drainage, Sidewalk/Curb Ramps, Curb & Gutter, S&PMs, and Signalization on SR 10 (US 90/Tennessee St) from SR 61 (US 27/Monroe St) to SR 265, just over 1.12 miles (CMP 8.444 to CMP 8.455 and CMP 0.000 to CMP 1.116); 403942-3-52-03: Retaining Wall Replacement; 403942-3- 52-04: City of Tallahassee Electric Ma
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Manufacturing (Industrial), Automotive
- Location
- Tallahassee, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR 10 Road Resurfacing (CO 012)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Improvements under this Contract consist of 403942-3-52-01: Milling & Resurfacing, Minor Drainage, Sidewalk/Curb Ramps, Curb & Gutter, S&PMs, and Signalization on SR 10 (US 90/Tennessee St) from SR 61 (US 27/Monroe St) to SR 265, just over 1.12 miles (CMP 8.444 to CMP 8.455 and CMP 0.000 to CMP 1.116); 403942-3-52-03: Retaining Wall Replacement; 403942-3- 52-04: City of Tallahassee Electric Manhole Adjustments; 403942-3-52-05: CenturyLink (Lumen Local) Manhole Adjustments; 403942-3-56-01 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tallahassee |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Manufacturing (Industrial), Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
