FL/DOT: SR 222 Roadway construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The improvements under this Contract consist of FPID 207533-2-52-01: installation of variable width traffic separator, milling and resurfacing, and other incidental construction on SR 222 (39th Avenue) at SR 25 (US 441) SW 13th Street in Alachua County and FPID 207611-5-52-01: milling and resurfacing, sidewalk, curb and gutters, traffic signals, highway signing, and other incidental construction o
- Status
- Closed
- Sector
- Car parking, Commercial, Road, Manufacturing (Industrial), Automotive
- Location
- Gainesville, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR 222 Roadway construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvements under this Contract consist of FPID 207533-2-52-01: installation of variable width traffic separator, milling and resurfacing, and other incidental construction on SR 222 (39th Avenue) at SR 25 (US 441) SW 13th Street in Alachua County and FPID 207611-5-52-01: milling and resurfacing, sidewalk, curb and gutters, traffic signals, highway signing, and other incidental construction on SR 222 (39th Avenue) from E of NW 40th Terrace to NW 24th Boulevard in Alachua County. LIMIT : ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Gainesville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Road, Manufacturing (Industrial), Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
