FL/DOT: SR 5 From Belvedere Rd To Okeechobee Blvd Resurface
Sector: Waste Processing and Treatment • Location: West Palm Beach, Florida, United States of America
Source: Dodge
The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, low-profile barrier, pedestrian LCD, arrow board, PCMS, signalization, traffic detection, barricade), protections (sediment, inlet), monitor existing structures (inspection, settlement, vibration), traffic monitoring site (sensor, loop), clearing and grubbing (standard, selective), eart
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Residential, Commercial, Cement, Advanced Electronics
- Location
- West Palm Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR 5 From Belvedere Rd To Okeechobee Blvd Resurface
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, low-profile barrier, pedestrian LCD, arrow board, PCMS, signalization, traffic detection, barricade), protections (sediment, inlet), monitor existing structures (inspection, settlement, vibration), traffic monitoring site (sensor, loop), clearing and grubbing (standard, selective), earthwork (excavation, embankment), concrete (curb, curb and gutter, valley gutter, sidewalk, drivewa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | West Palm Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Residential, Commercial, Cement, Advanced Electronics |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
