FL/DOT: SR 589 New Road Construction
Sector: Water Supply and Storage • Location: Lecanto, Florida, United States of America
Source: Dodge
Work consists of providing all labor, materials, equipment and incidentals necessary for the construction of SR 589 (Suncoast Parkway 2) including roadway, drainage, signing and pavement markings, lighting, signalization, ITS, bridge structures, toll facilities and landscaping, from CR 486 to CR 495, milepost 70.276 to milepost 75.707 in Citrus County (02470). No Pre-Bid Conference. Contractor mus
- Status
- Prospective
- Sector
- Water Supply and Storage, Consumer Products, Waste Processing and Treatment, Bridge, Road, Commercial
- Location
- Lecanto, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR 589 New Road Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work consists of providing all labor, materials, equipment and incidentals necessary for the construction of SR 589 (Suncoast Parkway 2) including roadway, drainage, signing and pavement markings, lighting, signalization, ITS, bridge structures, toll facilities and landscaping, from CR 486 to CR 495, milepost 70.276 to milepost 75.707 in Citrus County (02470). No Pre-Bid Conference. Contractor must be prequalified. Road Name: SUNCOAST II-PHASE 3A (SR589)-CR 486 TO CR 495 The State of Florida,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Lecanto |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Waste Processing and Treatment, Bridge, Road, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
