FL/DOT: SR 7 Resurfacing
Sector: Water Supply and Storage • Location: Florida, United States of America
Source: Dodge
The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, pedestrian LCD, arrow board, PCMS, signalization, traffic detection, barricade), protections (inlet, floating turbidity), monitor structures (inspection, settlement, vibration), TMS (vehicle sensor, inductive loop, cabinet), clearing/grubbing (standard, selective), concrete (removal, gr
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Advanced Electronics, Bridge, Residential, Rail, Waste Processing and Treatment, Cement, Automotive, Car parking, Mass Transit, Commercial
- Location
- Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR 7 Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, pedestrian LCD, arrow board, PCMS, signalization, traffic detection, barricade), protections (inlet, floating turbidity), monitor structures (inspection, settlement, vibration), TMS (vehicle sensor, inductive loop, cabinet), clearing/grubbing (standard, selective), concrete (removal, gravity wall, curb, curb and gutter, sidewalk, driveways), asphalt (milling, resurfacing, misc), gu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Advanced Electronics, Bridge, Residential, Rail, Waste Processing and Treatment, Cement, Automotive, Car parking, Mass Transit, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
