FL/DOT: SR 704 Road Resurfacing (CO 009)
Sector: Metal • Location: West Palm Beach, Florida, United States of America
Source: Dodge USA
The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, channelizing, arrow board, PCMS, barricade), protection (sediment barrier, inlet, tree), monitor existing structures (vibration), concrete (remove, curb/gutter, sidewalk/driveways, prestressed pole), asphalt (milling, resurfacing, miscellaneous), aluminum (signal pole pedestal, signal p
- Status
- Closed
- Sector
- Metal, Cement, Car parking, Rail, Steel, Road, Water Supply and Storage, Waste Processing and Treatment, Residential, Automotive, Manufacturing (Industrial), Commercial
- Location
- West Palm Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FL/DOT: SR 704 Road Resurfacing (CO 009)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, channelizing, arrow board, PCMS, barricade), protection (sediment barrier, inlet, tree), monitor existing structures (vibration), concrete (remove, curb/gutter, sidewalk/driveways, prestressed pole), asphalt (milling, resurfacing, miscellaneous), aluminum (signal pole pedestal, signal pole F&I, signal pole remove), railing (handrail/guiderail, guardrail, guardrail remove), pavement... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | West Palm Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Car parking, Rail, Steel, Road, Water Supply and Storage, Waste Processing and Treatment, Residential, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
