FL/DOT: SR 75 Resurfacing Improvements
Sector: Commercial • Location: Florida, United States of America
Source: Dodge USA
SR 75 (US 231) FROM SR 20 TO THE JACKSON COUNTY LINE The State of Florida, Department of Transportation, District 3, may be seeking a consultant to provide design services for SR 75 (US 231) from SR 20 to the Jackson Co. Line. The consultant will perform all services required to produce a complete set of construction plans and bid documents for the resurfacing of SR 75 (US 231) from South of SR 20
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial)
- Location
- Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FL/DOT: SR 75 Resurfacing Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SR 75 (US 231) FROM SR 20 TO THE JACKSON COUNTY LINE The State of Florida, Department of Transportation, District 3, may be seeking a consultant to provide design services for SR 75 (US 231) from SR 20 to the Jackson Co. Line. The consultant will perform all services required to produce a complete set of construction plans and bid documents for the resurfacing of SR 75 (US 231) from South of SR 20 to the Jackson County Line. Services will include, but are not limited to roadway design, intell... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
