FL/DOT: SR 811 RCA Blvd Donald Ross Rd Resurfacing (CO012)
Sector: Water Supply and Storage • Location: Palm Beach Gardens, Florida, United States of America
Source: Dodge
The Improvements under this Contract consist of, but are not limited to, MOT (standard, pedestrian/bicycle detour, low-profile barrier, signalization and maintenance, traffic detection and maintenance, arrow board, PCMS), environmental (sediment barrier, inlet protection), monitor existing structures (inspection, settlement, vibration), concrete (remove, curb and gutter, curb, traffic separator, s
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Car parking, Rail, Mass Transit, Automotive, Waste Processing and Treatment, Cement, Commercial, Manufacturing (Industrial)
- Location
- Palm Beach Gardens, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR 811 RCA Blvd Donald Ross Rd Resurfacing (CO012)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Improvements under this Contract consist of, but are not limited to, MOT (standard, pedestrian/bicycle detour, low-profile barrier, signalization and maintenance, traffic detection and maintenance, arrow board, PCMS), environmental (sediment barrier, inlet protection), monitor existing structures (inspection, settlement, vibration), concrete (remove, curb and gutter, curb, traffic separator, sidewalk, driveways), asphalt (milling, resurfacing), pavement markings (detectable, RPM, painted,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Palm Beach Gardens |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Car parking, Rail, Mass Transit, Automotive, Waste Processing and Treatment, Cement, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
