FL/DOT: SR 89 Road Resurfacing
Sector: Road • Location: Florida, United States of America
Source: Dodge
The consultant will perform all services required to produce a complete set of construction plans and bid documents for the resurfacing of SR 89 from CR 178 to SR 4. Services will include, but are not limited to, roadway design, signing and pavement marking, lighting, and survey. The State of Florida, Department of Transportation, District 3, seeking a consultant to provide design services for the
- Status
- Closed
- Sector
- Road, Commercial
- Location
- Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR 89 Road Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The consultant will perform all services required to produce a complete set of construction plans and bid documents for the resurfacing of SR 89 from CR 178 to SR 4. Services will include, but are not limited to, roadway design, signing and pavement marking, lighting, and survey. The State of Florida, Department of Transportation, District 3, seeking a consultant to provide design services for the consultant will perform all services required to produce a complete set of construction plans an... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Commercial |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
