FL/DOT: SR 89 Road Resurfacing
Closed · Florida · Last reported Nov 2024
Source: Dodge USA
SR 89 FROM SR 4 TO ALABAMA STATE LINE The State of Florida, Department of Transportation, District 3, may be seeking a consultant to provide design services for the consultant will perform all services required to produce a complete set of construction plans and bid documents for the resurfacing of SR 89 from SR 4 to Alabama State Line. Services will include but are not limited to roadway design,
- Status
- Closed
- Sector
- Road, Commercial
- Location
- Tallahassee, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FL/DOT: SR 89 Road Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SR 89 FROM SR 4 TO ALABAMA STATE LINE The State of Florida, Department of Transportation, District 3, may be seeking a consultant to provide design services for the consultant will perform all services required to produce a complete set of construction plans and bid documents for the resurfacing of SR 89 from SR 4 to Alabama State Line. Services will include but are not limited to roadway design, minor structures design, signing and pavement marking, survey and geotechnical. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tallahassee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
