FL/DOT: SR 93 Wrong-way Vehicle Detection System Install
Sector: Power Generation (CCGT) • Location: Tampa, Florida, United States of America
Source: Dodge
The Improvements under this Contract consist of constructing a Wrong-way Vehicle Detection System (WWVDS). The WWVDS installation includes installing a wrong-way detection system, fiber optic communication, power sub-system, conduit system, and testing for all 18 freeway ramps at various locations along I-275, I-4, and I-75, Districtwide (Pinellas, Hillsborough, and Pasco counties). Road Name SR 9
- Status
- Prospective
- Sector
- Power Generation (CCGT), Broadband, Road, Automotive, Telecommunications, Commercial
- Location
- Tampa, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR 93 Wrong-way Vehicle Detection System Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Improvements under this Contract consist of constructing a Wrong-way Vehicle Detection System (WWVDS). The WWVDS installation includes installing a wrong-way detection system, fiber optic communication, power sub-system, conduit system, and testing for all 18 freeway ramps at various locations along I-275, I-4, and I-75, Districtwide (Pinellas, Hillsborough, and Pasco counties). Road Name SR 93 (I-75), 93A (I-275) and SR 400 (I-4) Limist FROM MANATEE/PINELLAS CO LINE TO HERNANDO CO LINE . |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tampa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Broadband, Road, Automotive, Telecommunications, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
