FL/DOT: SR45 Highway Improvements
Sector: Commercial • Location: Clearwater, Florida, United States of America
Source: Dodge
Sr676/Sr45/Usb41/Causeway Blvd Fr Us301 to S of Us41/50th St 23720 - SR676/USB41/Causeway Blvd fr W of US301 to E of US41/50th St 23721 - SR574/Dr. Martin Luther King, Jr. Blvd fr W of Gallagher Rd to W of Oak Brook Ln RESURFACING Length: 4.304 SR574/DR. MLK JR. BLVD FROM W OF GALLAGHER RD. TO W OF OAK BROOK LN Consultant to provide construction engineering inspection services for SR676/SR45/Cause
- Status
- Closed
- Sector
- Commercial, Road, Bridge
- Location
- Clearwater, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FL/DOT: SR45 Highway Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sr676/Sr45/Usb41/Causeway Blvd Fr Us301 to S of Us41/50th St 23720 - SR676/USB41/Causeway Blvd fr W of US301 to E of US41/50th St 23721 - SR574/Dr. Martin Luther King, Jr. Blvd fr W of Gallagher Rd to W of Oak Brook Ln RESURFACING Length: 4.304 SR574/DR. MLK JR. BLVD FROM W OF GALLAGHER RD. TO W OF OAK BROOK LN Consultant to provide construction engineering inspection services for SR676/SR45/Causeway Blvd fr W of US301 to E of US41/50th St (BDI). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Clearwater |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Bridge |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
