FL/DOT: Traffic Control Devices & System (CO 010)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Improvements under this Contract consist of, but are not limited to, MOT, ITSFM documentation (subsurface, location), conduit (open trench, directional bore), fiber optic (underground, splice, connector, patch), pull/splice box, electrical (overhead service, underground service, service wire, service disconnect, power, uninterruptible power supply, remote power management), concrete (prestress
- Status
- Closed
- Sector
- Broadband, Cement, Power Generation (CCGT), Telecommunications, Road, Commercial
- Location
- Hollywood, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FL/DOT: Traffic Control Devices & System (CO 010)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Improvements under this Contract consist of, but are not limited to, MOT, ITSFM documentation (subsurface, location), conduit (open trench, directional bore), fiber optic (underground, splice, connector, patch), pull/splice box, electrical (overhead service, underground service, service wire, service disconnect, power, uninterruptible power supply, remote power management), concrete (prestressed pole, CCTV pole), ITS (cabinet, CCTV camera, managed field ethernet), and tree protection at t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Hollywood |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Cement, Power Generation (CCGT), Telecommunications, Road, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
