logo
ProjectPlanning Schematics

FL/DOT: US 41 Bridge Construction

Sector: Bridge • Location: Palm River-Clair Mel, Florida, United States of America

Source: Dodge USA

US 41/SR 45 AT CSX GRADE SEPARATION FR S OF SR 676 TO N OF SR 676 Type of Work: NEW BRIDGE CONSTRUCTION

Status
Prospective
Sector
Bridge, Road, Commercial
Location
Palm River-Clair Mel, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FL/DOT: US 41 Bridge Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FL/DOT: US 41 Bridge Construction” is an infrastructure initiative in the Bridge sector, located in Palm River-Clair Mel, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

US 41/SR 45 AT CSX GRADE SEPARATION FR S OF SR 676 TO N OF SR 676 Type of Work: NEW BRIDGE CONSTRUCTION

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Palm River-Clair Mel

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project