logo

Fleming Island Wastewater Treatment Facility BTU No. 1 Rehab

Sector: Water Supply and Storage • Location: Fleming Island, Florida, United States of America

Source: Dodge

Project
Closed

The work shall consist of the following but not limited to the Work identified in the Contract Documents. A. Mobilization/Demobilization, General Requirements, and Bonds and Insurance. B. Structural repair of Biological Treatment Unit (BTU) No. 1, which includes replacement of the tie rod/tube whaler system, crack repair, spall repair, exposed reinforcing repair, rebuild of damaged concrete surfac

Status
Closed
Sector
Water Supply and Storage, Cable car, Government, Cement, Waste Processing and Treatment, Commercial, Automotive, Telecommunications
Location
Fleming Island, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Fleming Island Wastewater Treatment Facility BTU No. 1 Rehab

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fleming Island Wastewater Treatment Facility BTU No. 1 Rehab” is an infrastructure initiative in the Water Supply and Storage sector, located in Fleming Island, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work shall consist of the following but not limited to the Work identified in the Contract Documents. A. Mobilization/Demobilization, General Requirements, and Bonds and Insurance. B. Structural repair of Biological Treatment Unit (BTU) No. 1, which includes replacement of the tie rod/tube whaler system, crack repair, spall repair, exposed reinforcing repair, rebuild of damaged concrete surfaces and replacing two anti-vortex baffles. C. Installation of new (owner-furnished) weir gate at B...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Fleming Island

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cable car, Government, Cement, Waste Processing and Treatment, Commercial, Automotive, Telecommunications

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project