logo

Flight Deck Thermal Management

Sector: Aerospace & Defense • Location: United States of America

Source: Grants.gov

Project
Archived

This research opportunity is soliciting alternatives to heat pipes for arresting the thermal impact from the exhaust plumes of new and impending aircraft on amphibious ships. Both above deck and below deck thermal management systems are being solicited. The objective is to develop systems that offer both above and below-deck options, are cost-effective to install or maintain, and last the serv

Project Information FAQ

Project Information

4 Q
The project “Flight Deck Thermal Management” is an infrastructure initiative in the Aerospace & Defense sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This research opportunity is soliciting alternatives to heat pipes for arresting the thermal impact from the exhaust plumes of new and impending aircraft on amphibious ships. Both above deck and below deck thermal management systems are being solicited. The objective is to develop systems that offer both above and below-deck options, are cost-effective to install or maintain, and last the service life of the ship. Deck thermal management systems should be capable of mitigating a heating rate of 16,000 to 24,000 BTU/minute and a total heat load capacity of 48,000 BTU to 2.2 MBTU over a time period. Critical thermal management technologies are to: spread, conduct, and/or dissipate heat with minimal thickness and minimal weight impact; comply within deck-height/flight operations constraints and horizontal configuration; carry structural load and meet survivability 4 requirements; integrate with ship structures; be installable in a shipyard environment; avoid generation of debris/products causing foreign object damage debris; and be compatible with Navy non-skid coatings. ONR anticipates making multiple contract and grant awards that total $12.5 million over a four year period, with $3 million available in FY2011, $4 million available in FY2012, $3.5 million in FY2013 and $2 million available in FY2014. The typical award amount will likely be in the range of $200,000 to $1 million per year.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data