Flight Deck Thermal Management
The status, timeline and source of this project. A free account opens every field.
Source: Grants.gov
This research opportunity is soliciting alternatives to heat pipes for arresting the thermal impact from the exhaust plumes of new and impending aircraft on amphibious ships. Both above deck and below deck thermal management systems are being solicited. The objective is to develop systems that offer both above and below-deck options, are cost-effective to install or maintain, and last the serv
- Status
- Closed
- Sector
- Aerospace & Defense, Geothermal, Seaport, Government, Commercial, Education, Residential, Forest Products and Packaging, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Flight Deck Thermal Management
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This research opportunity is soliciting alternatives to heat pipes for arresting the thermal impact from the exhaust plumes of new and impending aircraft on amphibious ships. Both above deck and below deck thermal management systems are being solicited. The objective is to develop systems that offer both above and below-deck options, are cost-effective to install or maintain, and last the service life of the ship. Deck thermal management systems should be capable of mitigating a heating rate of 16,000 to 24,000 BTU/minute and a total heat load capacity of 48,000 BTU to 2.2 MBTU over a time period. Critical thermal management technologies are to: spread, conduct, and/or dissipate heat with minimal thickness and minimal weight impact; comply within deck-height/flight operations constraints and horizontal configuration; carry structural load and meet survivability 4 requirements; integrate with ship structures; be installable in a shipyard environment; avoid generation of debris/products causing foreign object damage debris; and be compatible with Navy non-skid coatings. ONR anticipates making multiple contract and grant awards that total $12.5 million over a four year period, with $3 million available in FY2011, $4 million available in FY2012, $3.5 million in FY2013 and $2 million available in FY2014. The typical award amount will likely be in the range of $200,000 to $1 million per year. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Geothermal, Seaport, Government, Commercial, Education, Residential, Forest Products and Packaging, Manufacturing (Industrial) |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in United States of America
- SAT Terminal B
- Southwest Airlines BWI New Tech Ops Hangar East
- SFO United Airlines Terminal 3 Ticket Counter Redesign and Break Room Refresh
- TPA Parking Garage & Administration Building
- MDW Terminal & Concourse
- Seattle-Tacoma International Airport (SEA) International Arrivals Facility
- LAX Tom Bradley International Terminal Renovation, Apron, & Concourse Demolition
- SJC North Concourse
