logo

Flinders Island Hybrid Energy Hub

Sector: Commercial • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The project aims to use a combination of solar, wind, diesel, storage and enabling technologies to displace more than 60% of Flinders Island’s diesel generated energy. Hydro Tasmania will develop a modular hybrid energy solution with the potential to further drive down costs and move a step closer to delivering a commercially competitive product.Key resultsThe Flinders Island Hybrid Energy Hub pro

Project Information FAQ

Project Information

5 Q
The project “Flinders Island Hybrid Energy Hub” is an infrastructure initiative in the Commercial sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to use a combination of solar, wind, diesel, storage and enabling technologies to displace more than 60% of Flinders Island’s diesel generated energy. Hydro Tasmania will develop a modular hybrid energy solution with the potential to further drive down costs and move a step closer to delivering a commercially competitive product.Key resultsThe Flinders Island Hybrid Energy Hub project successfully increased targeted levels of annual renewable contribution up to 60%The Hub is able to run for periods of continuous zero-diesel operation (up to nearly 100 hours continuously and for approximately 50% of the year)The project installed a 200 kW DC solar farm, 900 kW wind turbine, 1.5 MW dynamic resistor, 850 kVA diesel-UPS, 750 kW/266 kWh battery, distribution line augmentation and feeder management system, all integrated into the existing diesel power stationThis was the first demonstrated application of Hydro Tasmania’s enablers-based, zero-diesel-capable systems to fully integrate solar generation as well as wind generation The project developed and matured workable designs for Hydro Tasmania’s containerised enablers and associated controls including switchgear, diesel-UPS, dynamic resistor and a control system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data