Flint River Sewage Pump Station Replacement
Sector: Waste Processing and Treatment • Location: Georgia, United States of America (USA)
Source: Atlanta Watershed
The existing 15 million gallons per day (MGD) pump station at Flint River is nearly 40 years old and is approaching the end of its useful life. The pump station has high pump failure rates, obsolete controls, and other issues associated with an older facility asset. The pump station has been previously retrofitted to provide additional capacity as needed, but its current configuration is inefficie
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | inactive / design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The existing 15 million gallons per day (MGD) pump station at Flint River is nearly 40 years old and is approaching the end of its useful life. The pump station has high pump failure rates, obsolete controls, and other issues associated with an older facility asset. The pump station has been previously retrofitted to provide additional capacity as needed, but its current configuration is inefficient and unable to provide for sustainable operations associated with current and future system flows. This could contribute to additional sewage spills and overflows in the sanitary sewer system. The scope of this project includes: Construct new pump station southeast of Runway 5 Increasing pumping capacity from 15 to 25 MGD Condition assessment of the 6-mile Flint River Force Main |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Waste Processing and Treatment projects in United States of America (USA)
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- Memorial Drive from BW 8 to Tallowood Road
- FM 646 from I-45 to Bayshore Boulevard
- SH 36 Improvements in Comanche County
- FM 494
- Pierce County Sewer and Traffic Operations Facility
- Northwest Corridor Managed Lanes P3
- Woodall Rodgers Deck Park
