Floating Dock Replacement
Closed · Manitoba · Last reported Oct 2022
Source: Dodge USA
The Contractor will be responsible for the following: 1. Supply and delivery of 6 (six) 1.219 X 6.096 finger float wharves to Dauphin River Harbour. 2. Supply and delivery of 3 (three) 1.829 X 6.096 principal float wharves to Dauphin River Harbour. Note: Removal of existing float wharves, unloading of new float wharves upon delivery and installation of new float wharves to be completed by others.
- Status
- Closed
- Sector
- Seaport, Commercial, Manufacturing (Industrial)
- Location
- Dauphin, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Floating Dock Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor will be responsible for the following: 1. Supply and delivery of 6 (six) 1.219 X 6.096 finger float wharves to Dauphin River Harbour. 2. Supply and delivery of 3 (three) 1.829 X 6.096 principal float wharves to Dauphin River Harbour. Note: Removal of existing float wharves, unloading of new float wharves upon delivery and installation of new float wharves to be completed by others. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Manitoba |
City | Dauphin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Seaport, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects in Canada
- Canada Post Pacific Processing Centre
- Maritime Helicopter Support Facilities - 12 Wing Shearwater
- Residue Storage Areas and Dams
- Long Harbour Processing Plant Site
- Winnipeg Art Galley
- Renforcement du réseau de transport à 315 kV de l’Abitibi‑Témiscamingue
- Modernisation du complexe de Beauharnois‑Les Cèdres
- Marine Use Strategy
