logo
ProjectApproved

Floating Solar Array at Cavendish Dock

Sector: Solar • Location: Barrow-in-Furness, Cumbria, United Kingdom

Source: Nwemail Co Uk

Construction of a 35-40MWp floating solar array consisting of approximately 46,500 solar panels, 80 inverters, and 10 transformers at Cavendish Dock to serve Barrow and BAE for 50 years.

Status
Prospective
Sector
Solar
Location
Barrow-in-Furness, Cumbria, United Kingdom
Updated
19 Nov 2026
Source
Nwemail Co Uk

ConstructChat

Ask ConstructChat about Floating Solar Array at Cavendish Dock

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Floating Solar Array at Cavendish Dock” is an infrastructure initiative in the Solar sector, located in Barrow-in-Furness, Cumbria, United Kingdom. Taiyo aggregates data on it from Nwemail Co Uk.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Construction of a 35-40MWp floating solar array consisting of approximately 46,500 solar panels, 80 inverters, and 10 transformers at Cavendish Dock to serve Barrow and BAE for 50 years.

Original sector

Planning and development

Location

Country

United Kingdom (UK)

State

Cumbria

City

Barrow-in-Furness

Source

Source

Nwemail Co Uk

URL

More Details

Record type

Project

Sector

Solar

Article published date

2025-12-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project