logo
ProjectClosed

Flood Control Channel Erosion Repair

Closed · Alberta · Last reported Sep 2025

Source: Dodge

Erosion repair on approximately 2.5 km of ditch, bank shaping and compactions. Armor banks of ditch (rip rap) installation of guardrail and coconut matting. The guardrail will be provided by Mackenzie County, the contractor will be responsible for sourcing coconut matting.

Status
Closed
Sector
Commercial, Manufacturing (Industrial), Government
Location
Fort Vermilion, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Flood Control Channel Erosion Repair

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Flood Control Channel Erosion Repair” is an infrastructure initiative in the Commercial sector, located in Fort Vermilion, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Erosion repair on approximately 2.5 km of ditch, bank shaping and compactions. Armor banks of ditch (rip rap) installation of guardrail and coconut matting. The guardrail will be provided by Mackenzie County, the contractor will be responsible for sourcing coconut matting.

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Fort Vermilion

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Manufacturing (Industrial), Government

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project