logo

Flood Control Channel Erosion Repair

Sector: Commercial • Location: Fort Vermilion, Alberta, Canada

Source: Dodge

Project
Closed

Erosion repair on approximately 2.5 km of ditch, bank shaping and compactions. Armor banks of ditch (rip rap) installation of guardrail and coconut matting. The guardrail will be provided by Mackenzie County, the contractor will be responsible for sourcing coconut matting.

Project Information FAQ

Project Information

4 Q
The project “Flood Control Channel Erosion Repair” is an infrastructure initiative in the Commercial sector, located in Fort Vermilion, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Erosion repair on approximately 2.5 km of ditch, bank shaping and compactions. Armor banks of ditch (rip rap) installation of guardrail and coconut matting. The guardrail will be provided by Mackenzie County, the contractor will be responsible for sourcing coconut matting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data