Flood Emergency Project
One of 3,141 projects Taiyo tracks in Kyrgyz Republic.
Source: World Bank Group
The Flood Emergency Project seeks to rehabilitate or reconstruct: a) damaged flood protection infrastructure along rivers; and b) irrigation infrastructure. The project consists of two components. 1) Rehabilitation/reconstruction of river protection and irrigation infrastructure will finance repair and rehabilitation of eroded river embankments in five rivers, together with rehabilitation and reco
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Cement, Raw Materials, Government
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Flood Emergency Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Flood Emergency Project seeks to rehabilitate or reconstruct: a) damaged flood protection infrastructure along rivers; and b) irrigation infrastructure. The project consists of two components. 1) Rehabilitation/reconstruction of river protection and irrigation infrastructure will finance repair and rehabilitation of eroded river embankments in five rivers, together with rehabilitation and reconstruction of 23 protective spurs. The component will also finance the rehabilitation and reconstruction of selected irrigation infrastructure inside and outside of river beds at 16 different schemes. Within the river beds the repair works will include intake spurs, irrigation conveyance canals and their embankments, spurs to protect such embankments, and spillways and gated headworks. Outside the river beds the repair works will include drain overpass reconstruction, spillway reconstruction from debris dams and repair of concrete lining. 2) Project management and implementation support will establish a project implementation unit for the project's daily management. Consulting firms will be contracted for the preparation of feasibility studies. The component will also support two study tours to countries where different methods of flood protection are practiced. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Kyrgyzstan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Cement, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kyrgyz Republic
- IWS Smart Farm
- Myrzaki-Kurshab water extension
- Chui Water Resource Efficiency
- City of Osh water utility joint venture
- Building Capacity for the Formation and Management of Water Users Associations
- KWRF - Naryn Water Sub-Project Extension II
- Kok-Dzhangak water
- Additional Financing for the Multisector Activities Support Facility 2025–2030
