Flood Emergency Project
Sector: Road • Location: Poland
Source: World Bank Group
The objectives of the Emergency Flood Recovery Project are to assist the Government of Poland in: a) restoring basic infrastructure in municipalities and rural areas affected by the flood by repairing structures and facilities of economic and social importance, and by restoring lifeline facilities and services for currently displaced people; and b) reducing vulnerability and risk of future floods.
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Flood Emergency Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Emergency Flood Recovery Project are to assist the Government of Poland in: a) restoring basic infrastructure in municipalities and rural areas affected by the flood by repairing structures and facilities of economic and social importance, and by restoring lifeline facilities and services for currently displaced people; and b) reducing vulnerability and risk of future floods. The project encompasses three main components. First, the municipal and rural infrastructure component includes technical assistance, design, and investments to restore infrastructure at the municipal and gmina level. Second, the flood management and hazard reduction component includes technical assistance, design, and urgent investments to upgrade hydrotechnical infrastructure; modernize flood management systems, and improve forecasting and planning. Third, the project administration and technical assistance component will establish a Project Coordination Unit (PCU) to help implement procurement and disbursement activities associated with the Project. |
Original sector | FY17 - Energy and Extractives,FY17 - Industry, Trade and Services,FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management,Transportation |
Budget |
Location
Country | Poland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Design and construction of 8.6 km of the S19 highway between Solec and Odcinek (Poland)
- Ostroleka C CombinedCycle Power Plant Poland
- Baltic Power Offshore Wind Farm Baltic Sea
- Poland-Slovakia Gas Interconnection
- POLAND ROAD MODERNISATION II
- POLAND - A4 HIGHWAYS PROJECT (A+B)
- TORUN URBAN INFRASTRUCTURE
- A2 MOTORWAY BERLIN-WARS -POZNAN BYPASS
