Flood Mitigation Improvements
Closed · New York · Last reported Nov 2024
Source: Dodge USA
The scope of this Contract is to construct flood barriers at both ends of the Battery Park Tunnel, as well as to floodproof Battery Park and West Street Tunnels ventilation shafts, transformer vaults and other openings that could allow floodwater to enter the tunnels.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Tunnel, Energy Storage, Car parking, Automotive, Road, Water Supply and Storage
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Flood Mitigation Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of this Contract is to construct flood barriers at both ends of the Battery Park Tunnel, as well as to floodproof Battery Park and West Street Tunnels ventilation shafts, transformer vaults and other openings that could allow floodwater to enter the tunnels. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Tunnel, Energy Storage, Car parking, Automotive, Road, Water Supply and Storage |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
