Flood Mitigation Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
FY 2020 Community Development Block Grant Flood Mitigation Improvements Contract No 2020 1 The work includes the furnishing of all labor material and equipment necessary or required to complete all work set forth in these Specifications and shown on the Plans and consists of concrete and masonry work installation of associated electrical equipment installation of flood barrier planks and flood pro
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Cement, Government, Waste Processing and Treatment, Water Supply and Storage
- Location
- Linden, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Flood Mitigation Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | FY 2020 Community Development Block Grant Flood Mitigation Improvements Contract No 2020 1 The work includes the furnishing of all labor material and equipment necessary or required to complete all work set forth in these Specifications and shown on the Plans and consists of concrete and masonry work installation of associated electrical equipment installation of flood barrier planks and flood proof personnel doors conduit and pipe penetration waterproofing and floor drain inline backwater va... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Linden |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Cement, Government, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
