FLOOD RECOVERY-INDUSTRY
Sector: Water Supply and Storage • Location: Romania
Source: World Bank Group
The project consists of: (a) investments in mining and industrial enterprises damaged by the 1975 floods, to replace flood-damaged machinery and spare parts, repair damaged buildings and infrastructure, reopen mines blocked by silt, and replenish damaged and lost inventories; (b) rehabilitation of 285 irrigation, drainage and flood control works which were damaged by the floods; (c) improvement of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of: (a) investments in mining and industrial enterprises damaged by the 1975 floods, to replace flood-damaged machinery and spare parts, repair damaged buildings and infrastructure, reopen mines blocked by silt, and replenish damaged and lost inventories; (b) rehabilitation of 285 irrigation, drainage and flood control works which were damaged by the floods; (c) improvement of Romania's existing hydrological data system by establishing an automated flood warning system which will include the installation of remote sensing stations to record rainfall, temperatures and river flows, and facilities to transmit and analyze this data; (d) investments (in crop or livestock production) of farm enterprises which suffered losses as a result of the floods in excess of 20 percent of their respective annual production planned for 1975; and (e) reconstruction of flood-damaged transport works. The project consists of: (a) investments in mining and industrial enterprises damaged by the 1975 floods, to replace flood-damaged machinery and spare parts, repair damaged buildings and infrastructure, reopen mines blocked by silt, and replenish damaged and lost inventories; (b) rehabilitation of 285 irrigation, drainage and flood control works which were damaged by the floods; (c) improvement of Romania's existing hydrological data system by establishing an automated flood warning system which will include the installation of remote sensing stations to record rainfall, temperatures and river flows, and facilities to transmit and analyze this data; (d) investments (in crop or livestock production) of farm enterprises which suffered losses as a result of the floods in excess of 20 percent of their respective annual production planned for 1975; and (e) reconstruction of flood-damaged transport works. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
