Flood Response & Recovery Emergent Culvert Replacement
Closed · Manitoba · Last reported Sep 2022
Source: Dodge USA
Install three (3) corrugated steel culverts by open trench cut (including surface restoration) through Provincial Trunk Highway 17, 2.5 km south of PTH 68, in the Municipality of Fisher.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Steel, Waste Processing and Treatment, Metal, Commercial
- Location
- Riverton, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Flood Response & Recovery Emergent Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install three (3) corrugated steel culverts by open trench cut (including surface restoration) through Provincial Trunk Highway 17, 2.5 km south of PTH 68, in the Municipality of Fisher. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Manitoba |
City | Riverton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Steel, Waste Processing and Treatment, Metal, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
