logo

Floodgate Port of Sevilla

Sector: Bridge • Location: Spain

Source: FCC Construction

Project
Closed

The works consist of the execution of a new lock system located in the 434-metre long Alfonso XIII Channel, where it meets the River Guadalquivir, with capacity for towed ships. This will provide more space for docks and also increase the safety of port installations as well as of the city itself and improve the navigability of the Guadalquivir.In an area adjacent to the lock there is a navigation

Project Information FAQ

Project Information

3 Q
The project “Floodgate Port of Sevilla” is an infrastructure initiative in the Bridge sector, located in Spain. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The works consist of the execution of a new lock system located in the 434-metre long Alfonso XIII Channel, where it meets the River Guadalquivir, with capacity for towed ships. This will provide more space for docks and also increase the safety of port installations as well as of the city itself and improve the navigability of the Guadalquivir.In an area adjacent to the lock there is a navigation channel in which dredging will also be executed and in addition, two 175-metre long support docks will be designed.Furthermore, the project includes the execution of three mobile bridges; two are 44 metres long and 12 metres wide for roadways and the other is a railway bridge of the same length, but 6.10 metres wide, with a deck that tilts around a horizontal axis coinciding with the line of supports that allow transits that are transversal to the river course.The following complete these works: control buildings, office, machinery, workshop and storage facilities, urban development and electromechanical installations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data