logo
ProjectClosed

Floods Emergency Recovery Project

One of 3,021 projects Taiyo tracks in Serbia.

Source: World Bank

The Floods Emergency Recovery Project of Serbia has an objective to: (i) help restore power system capability to reliably meet domestic demand; (ii) protect livelihoods of farmers in flood affected areas; (iii) protect people and assets from floods; and (iv) improve the Borrowers capacity to respond effectively to disasters. The project consists of four components: (1) Energy Sector Support; (2) A

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government
Location
Serbia
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Floods Emergency Recovery Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Floods Emergency Recovery Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Serbia. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Floods Emergency Recovery Project of Serbia has an objective to: (i) help restore power system capability to reliably meet domestic demand; (ii) protect livelihoods of farmers in flood affected areas; (iii) protect people and assets from floods; and (iv) improve the Borrowers capacity to respond effectively to disasters. The project consists of four components: (1) Energy Sector Support; (2) Agricultural Sector Support; (3) Flood Protection; and (4) Contingent Emergency Response. The objective of component one is to help restore power system capability to reliably meet domestic demand through power purchases, improved reliability of the distribution system and energy conservation measures, and help the restoration of strategic energy assets. Component 2 will support the ongoing Farm Incentives Program in order to protect the livelihood of farmers affected by the floods and offset their income losses. The objective of component three is to support urgent rehabilitation of flood protection and drainage control infrastructure, and strengthen the technical capacity of government agencies for improved flood prevention and management. Component four is to improve Serbia’s capacity to better respond to disasters. Following an adverse natural or man-made event that causes a major disaster; the Government of Serbia may request the Bank to re-allocate project funds to this component to partially cover emergency response and recovery costs. This component could also be used to channel additional funds should they become available as a result of the emergency.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Serbia

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project