Floodwalls Construction
Sector: Water Supply and Storage • Location: Byrnes Mill, Missouri, United States of America
Source: Dodge
The Project includes the following Work: 1. The development of the Old Towne Flood Mitigation System including but not limited to, the final grading of an earthen floodwall along Flat Creek from west of Bald Hill Road to Highway 109, grading of a new detention basin, construction of a new storm water pump station with 36 inch discharge pipes, a 60 inch gravity outfall, additional storm water conve
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Residential
- Location
- Byrnes Mill, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Floodwalls Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: 1. The development of the Old Towne Flood Mitigation System including but not limited to, the final grading of an earthen floodwall along Flat Creek from west of Bald Hill Road to Highway 109, grading of a new detention basin, construction of a new storm water pump station with 36 inch discharge pipes, a 60 inch gravity outfall, additional storm water conveyance piping, and all electrical. 2. Elevating the Waste Water Treatment Plant (WWTP) lagoon berm... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Byrnes Mill |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
