logo

Floodwood 2024 Watermain Extension

Sector: Metal • Location: Floodwood, Minnesota, United States of America

Source: Dodge USA

Project
Closed

Major quantities of the Work include: Common Excavation: 468 CY 15" CMP Pipe Culvert: 286 LIN FT 18" CMP Pipe Culvert: 54 LIN FT Hydrant and Gate Valve: 1 Each 6" Watermain: 20 LIN FT 8" Watermain: 751 LIN FT 1" Type K Copper Pipe: 120 LIN FT Turf Establishment: 0.5 AC

Project Information FAQ

Project Information

4 Q
The project “Floodwood 2024 Watermain Extension” is an infrastructure initiative in the Metal sector, located in Floodwood, Minnesota, United States of America. Taiyo aggregates data on it from Dodge USA.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Major quantities of the Work include: Common Excavation: 468 CY 15" CMP Pipe Culvert: 286 LIN FT 18" CMP Pipe Culvert: 54 LIN FT Hydrant and Gate Valve: 1 Each 6" Watermain: 20 LIN FT 8" Watermain: 751 LIN FT 1" Type K Copper Pipe: 120 LIN FT Turf Establishment: 0.5 AC

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data