Florianópolis Bus Rapid Transit (BRT) PPP Project
One of 10,000+ projects Taiyo tracks in Brazil.
Source: InfraPPPWorld
The winning company will provide, operate and maintain the infrastructure of the BRT system. The concession will have a period of 25 years and the value of the contract is of BRL1.1 billion (US$322 million).In a first stage 57.5 km of the BRT will be implemented, with 36 stations and four integration terminals. The operational control system will supervise the entire operation of the system, throu
- Status
- Prospective
- Sector
- Transport
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Florianópolis Bus Rapid Transit (BRT) PPP Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The winning company will provide, operate and maintain the infrastructure of the BRT system. The concession will have a period of 25 years and the value of the contract is of BRL1.1 billion (US$322 million).In a first stage 57.5 km of the BRT will be implemented, with 36 stations and four integration terminals. The operational control system will supervise the entire operation of the system, through the Control Center Operational. |
Original sector | Transport |
Procurement method |
Location
Country | Brazil |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
