logo
ProjectPlanned

Florida Wireless EV Charging Lane Pilot

Sector: Power Generation (CCGT) • Location: Florida, United States

Source: Deseret News

A new 4.4-mile road is being built in Florida to connect Lake and Orange counties, featuring a small section of less than a mile dedicated to testing wireless electric vehicle charging lanes. The project involves embedding magnetic charging coils under the road to wirelessly charge electric vehicles equipped with special attachments while driving. Vehicle owners will be billed automatically for el

Status
Prospective
Sector
Power Generation (CCGT), Electric Vehicles (EVs), Cement, Broadband, Automotive, Telecommunications
Location
Florida, United States of America
Updated
22 Jul 2026
Source
Deseret News

ConstructChat

Ask ConstructChat about Florida Wireless EV Charging Lane Pilot

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Florida Wireless EV Charging Lane Pilot” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Florida, United States. Taiyo aggregates data on it from Deseret News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A new 4.4-mile road is being built in Florida to connect Lake and Orange counties, featuring a small section of less than a mile dedicated to testing wireless electric vehicle charging lanes. The project involves embedding magnetic charging coils under the road to wirelessly charge electric vehicles equipped with special attachments while driving. Vehicle owners will be billed automatically for electricity usage. The pilot aims to gain insights into designing highways with precast concrete panels to accommodate EV infrastructure and could influence future road construction in the state.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Florida

Source

Source

Deseret News

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Electric Vehicles (EVs), Cement, Broadband, Automotive, Telecommunications

Article published date

2026-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project