Flushing High School
Sector: Water Supply and Storage • Location: Flushing, New York, United States of America
Source: Dodge
Remove and replace exist. sidewalks provide excavation to install new water proofing installation, replace exist. area drains. Remove and replace exist. concrete encased steel beam on old coal chute below areaway. Repoint bricks & interior plaster repair
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Steel, Government, Commercial, Car parking, Automotive, Metal, Waste Processing and Treatment
- Location
- Flushing, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Flushing High School
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove and replace exist. sidewalks provide excavation to install new water proofing installation, replace exist. area drains. Remove and replace exist. concrete encased steel beam on old coal chute below areaway. Repoint bricks & interior plaster repair |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Flushing |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Government, Commercial, Car parking, Automotive, Metal, Waste Processing and Treatment |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
