Fly Creek Water Main Replacement
Sector: Metal • Location: Fairhope, Alabama, United States of America
Source: Dodge USA
Option 1 Directional bore (12 HDPE pipe) under Woodlands Drive and across Fly Creek to repair an existing 12 water main Option 2 Directional bore (12 HDPE pipe) under Woodlands Drive and aerial crossing on an existing pedestrian bridge (12 ductile iron pipe) across Fly Creek to repair an existing 12 water main Option 3 Directional bore (12 HDPE pipe) under Fly Creek to repair an existing 12 water
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Bridge, Government, Steel, Commercial, Waste Processing and Treatment
- Location
- Fairhope, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fly Creek Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Option 1 Directional bore (12 HDPE pipe) under Woodlands Drive and across Fly Creek to repair an existing 12 water main Option 2 Directional bore (12 HDPE pipe) under Woodlands Drive and aerial crossing on an existing pedestrian bridge (12 ductile iron pipe) across Fly Creek to repair an existing 12 water main Option 3 Directional bore (12 HDPE pipe) under Fly Creek to repair an existing 12 water main Option 4 Aerial crossing on existing pedestrian bridge (12 ductile iron pipe) across Fly Cre... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Fairhope |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Bridge, Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
