logo

FM 148 Bypass

Sector: Water Supply and Storage • Location: TX, United States of America

Source: US Department of Transportation (USDOT)

Project
Closed

Other Agencies with Actions or Authorizations: Department of the Army, US Army Corps of Engineers - Regulatory Description: The proposed project involves construction of a new location rural roadway connecting FM 148 with US 175, a distance of approximately 1.6 miles. The proposed roadway would construct a two-lane facility consisting of two 12-foot wide travel lanes (one in each direction) with 8

Project Information FAQ

Project Information

5 Q
The project “FM 148 Bypass” is an infrastructure initiative in the Water Supply and Storage sector, located in TX, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: Department of the Army, US Army Corps of Engineers - Regulatory Description: The proposed project involves construction of a new location rural roadway connecting FM 148 with US 175, a distance of approximately 1.6 miles. The proposed roadway would construct a two-lane facility consisting of two 12-foot wide travel lanes (one in each direction) with 8-foot outside shoulders, and turn lanes. The proposed FM 148 Bypass at its southern terminus would require changes to approximately 1,927 linear feet of existing FM 148 just east of the City of Crandall. At its northern terminus, the proposed project would have at-grade connections with US 175 frontage roads, improvements to which have been proposed by others. Approximately 3,850 feet of US 175 would be reconstructed to create an overpass crossing of the FM 148 Bypass. The FM 148 roadway would have a ROW of 164 feet to 230 feet in width to incorporate a left turn lane. Other construction activities would include drainage improvements to manage water crossings of the proposed roadway. The proposed project would require approximately 33.0 acres of proposed ROW and 2.2 acres of proposed permanent drainage easements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data