FM 2818 (Harvey Mitchell Parkway) widening
Implementation · United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
The purpose of this project is to enhance capacity, address congestion, and improve safety along FM 2818 (Harvey Mitchell Parkway). The project limits are from 0.5 miles north of FM 60 (Raymond Stotzer Parkway) to FM 2154 (Wellborn Road), with a length of 3.2 miles. Small portions of Right-of-Way are required for sidewalks at intersecting roadways.
- Status
- Under Construction
- Sector
- Car parking, Road, Government, Automotive
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Texas Department of Transportation (TxDOT)
ConstructChat
Ask ConstructChat about FM 2818 (Harvey Mitchell Parkway) widening
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | implementation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to enhance capacity, address congestion, and improve safety along FM 2818 (Harvey Mitchell Parkway). The project limits are from 0.5 miles north of FM 60 (Raymond Stotzer Parkway) to FM 2154 (Wellborn Road), with a length of 3.2 miles. Small portions of Right-of-Way are required for sidewalks at intersecting roadways. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Texas Department of Transportation (TxDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive |
Article published date | 2023-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
