FM 362 BS REP, PLN, PERMEABLE FRICT CRS, SURF TRT, PV MRK from 500' NORTH OF US 290 to FM 1488
The status, timeline and source of this project. A free account opens every field.
Source: Texas Department of Transportation (TXDOT)
Project
Closed
- Status
- Closed
- Sector
- Solar, Government
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Texas Department of Transportation (TXDOT)
ConstructChat
Ask ConstructChat about FM 362 BS REP, PLN, PERMEABLE FRICT CRS, SURF TRT, PV MRK from 500' NORTH OF US 290 to FM 1488
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Project Information FAQ
Project Information
5 Q
Participants
Sponsoring Agency |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Texas Department of Transportation (TXDOT) |
URL |
More Details
Record type | Project |
Sector | Solar, Government |
Article published date | 2025-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.
