logo

FM 407 Widening Project

Sector: Road • Location: Justin, Texas, United States

Source: National Today

Project
Planned

The project involves widening an 11.5-mile stretch of FM 407 in southern Denton County from two lanes to a six-lane, urban-divided road. The right-of-way will be expanded from 80-90 feet to about 140 feet, including pedestrian and bike accommodations. Approximately six residences will be affected with relocation assistance available.

Status
Prospective
Sector
Road
Location
Justin, Texas, United States of America
Updated
22 Jul 2026
Source
National Today

ConstructChat

Ask ConstructChat about FM 407 Widening Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “FM 407 Widening Project” is an infrastructure initiative in the Road sector, located in Justin, Texas, United States. Taiyo aggregates data on it from National Today.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves widening an 11.5-mile stretch of FM 407 in southern Denton County from two lanes to a six-lane, urban-divided road. The right-of-way will be expanded from 80-90 feet to about 140 feet, including pedestrian and bike accommodations. Approximately six residences will be affected with relocation assistance available.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Texas

City

Justin

Source

Source

National Today

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-04-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project