FM 494

Sector: Road • Location: United States of America (USA)

Source: Texas Department of Transportation (TxDOT)

Project
Implementation

FM 494 (Shary Road), between SH 107 and FM 1924 (Mile 3 Road), is in need of improvements to enhance safety, accommodate a growing population and increasing traffic, and provide a safer route for pedestrians. TxDOT, in coordination with Hidalgo County and the cities of Palmhurst, McAllen and Alton, is working on the proposed project to continue with the improvement of the FM 494 (Shary Road) corri

Project Information FAQ

Project Information

4 Q
The project “FM 494” is an infrastructure initiative in the Road sector, located in United States of America (USA). Taiyo aggregates data on it from Texas Department of Transportation (TxDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

FM 494 (Shary Road), between SH 107 and FM 1924 (Mile 3 Road), is in need of improvements to enhance safety, accommodate a growing population and increasing traffic, and provide a safer route for pedestrians. TxDOT, in coordination with Hidalgo County and the cities of Palmhurst, McAllen and Alton, is working on the proposed project to continue with the improvement of the FM 494 (Shary Road) corridor. The proposed project includes: Four 12-foot-wide travel lanes (two lanes in each direction) One 16-foot-wide continuous left turn lane 10-foot-wide outside shoulders An underground storm drain system Two drainage outfalls The proposed project would be constructed in two phases: Phase I from SH 107 to FM 676 (Mile 5) is funded for construction in 2022 but could start in 2018. The necessary right of way (ROW) will be acquired after receiving environmental clearance. Phase II from FM 676 (Mile 5 Road) to FM 1924 (Mile 3 Road) is currently unfunded for ROW and construction. Because Phase I is currently under study, the study for Phase II is also being completed in anticipation of future funding.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data