logo

FM 518 Widening Project in Pearland

Sector: Car parking • Location: Pearland, Texas, United States

Source: ABC13 Houston

Project
Planned

TxDOT plans to widen FM 518 in Pearland from SH 288 to Halbert, expanding the road from two lanes to three lanes each way and adding a continuous sidewalk. The project will require some local businesses to relocate or shut down due to proximity to the future roadway. The expansion is divided into two parts: the first from SH 288 to Cullen starting construction in late 2027, and the second from Cul

Status
Prospective
Sector
Car parking, Automotive, Road
Location
Pearland, Texas, United States of America
Updated
22 Jul 2026
Source
ABC13 Houston

ConstructChat

Ask ConstructChat about FM 518 Widening Project in Pearland

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FM 518 Widening Project in Pearland” is an infrastructure initiative in the Car parking sector, located in Pearland, Texas, United States. Taiyo aggregates data on it from ABC13 Houston.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

TxDOT plans to widen FM 518 in Pearland from SH 288 to Halbert, expanding the road from two lanes to three lanes each way and adding a continuous sidewalk. The project will require some local businesses to relocate or shut down due to proximity to the future roadway. The expansion is divided into two parts: the first from SH 288 to Cullen starting construction in late 2027, and the second from Cullen to Halbert starting near the end of 2028. Each part is expected to take 3 to 4 years to complete with a combined cost of $187 million.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Texas

City

Pearland

Source

Source

ABC13 Houston

URL

More Details

Record type

Project

Sector

Car parking, Automotive, Road

Article published date

2026-07-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project