FM 824 REPLACE TIMBER SUBSTRUCTURE from AT WAFER CREEK
Sector: Forest Products and Packaging • Location: Texas, United States of America
Source: Texas Department of Transportation (TXDOT)
Project
Closed
- Status
- Closed
- Sector
- Forest Products and Packaging, Bridge, Government
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Texas Department of Transportation (TXDOT)
ConstructChat
Ask ConstructChat about FM 824 REPLACE TIMBER SUBSTRUCTURE from AT WAFER CREEK
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Project Information FAQ
Project Information
5 Q
Participants
Sponsoring Agency |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Texas Department of Transportation (TXDOT) |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Bridge, Government |
Article published date | 2025-06-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- CS 572/OAK STREET FROM REYNOLDS STREET TO BURNS STREET - TIA
- CR 29/OLD WEST POINT ROAD @ CHATTAHOOCHEE RIVER TRIB
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202613
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202614
- GLENWOOD-LUMBER CITY ROAD
- CALHOUN STREET FROM JONES STREET TO S OF JONES STREET - TIA
- JOHNSON STREET IN LUMBER CITY - TIA
- HELEN STREET IN LUMBER CITY
