logo

FM 89 (Buffalo Gap Road) Project

Sector: Commercial • Location: United States of America (USA)

Source: Texas Department of Transportation (TxDOT)

Project
Implementation

In 2015, TxDOT, the Abilene MPO and the city of Abilene identified FM 89 (Buffalo Gap Road) as a top priority transportation project candidate. FM 89 is the main arterial highway between the communities of Abilene and Wylie and has a variable mix of residential and commercial properties along the roadway. As these communities have expanded over the past several years, traffic from US 83/84 to Chim

Project Information FAQ

Project Information

4 Q
The project “FM 89 (Buffalo Gap Road) Project” is an infrastructure initiative in the Commercial sector, located in United States of America (USA). Taiyo aggregates data on it from Texas Department of Transportation (TxDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2015, TxDOT, the Abilene MPO and the city of Abilene identified FM 89 (Buffalo Gap Road) as a top priority transportation project candidate. FM 89 is the main arterial highway between the communities of Abilene and Wylie and has a variable mix of residential and commercial properties along the roadway. As these communities have expanded over the past several years, traffic from US 83/84 to Chimney Rock Road has increased significantly, creating congestion, increased crash rates and several other safety concerns for the traveling public, as well as pedestrians. In an effort to enhance the safety for all users of FM 89, a transportation study was conducted to help identify improvements that could be made to the roadway. This study analyzed issues such as: Impacts to safety through access management with the use of raised medians Drainage issues and possible solutions Ways to provide improved pedestrian access Right of way needs for future roadway expansion Environmental impacts Public involvement

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data