FM Diversion Construction Project
Sector: Mass Transit • Location: Fargo, North Dakota, United States
Source: Construction Equipment Guide
The FM Diversion project involves constructing a 30-mile stormwater diversion channel with 19 crossings, including bridges and rail track work, to provide permanent flood protection for the Fargo-Moorhead area. Recent progress includes opening two more crossings to traffic, completing bridge work with 500 girders and 28,000 cubic yards of concrete, rerouting westbound rail traffic at the KO crossi
- Status
- Under Construction
- Sector
- Mass Transit, Cement, Rail, Bridge
- Location
- Fargo, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Construction Equipment Guide
ConstructChat
Ask ConstructChat about FM Diversion Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The FM Diversion project involves constructing a 30-mile stormwater diversion channel with 19 crossings, including bridges and rail track work, to provide permanent flood protection for the Fargo-Moorhead area. Recent progress includes opening two more crossings to traffic, completing bridge work with 500 girders and 28,000 cubic yards of concrete, rerouting westbound rail traffic at the KO crossing, and completing the last concrete placements for the channel crossings. ASN Constructors also assembled and installed the horizontal truss segment of the Maple River Aqueduct's vertical lift gate support structure to regulate river flows during extreme flood risk. |
Original sector | Infrastructure |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Fargo |
Source
Source | Construction Equipment Guide |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Cement, Rail, Bridge |
Article published date | 2026-04-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
