Folly Beach Renourishment
Sector: Aerospace & Defense • Location: Folly Beach, South Carolina, United States
Source: DVIDS
The Folly Beach Renourishment project aims to renourish Folly Beach for coastal storm damage reduction, dredge the Folly River federal navigation channel, and place material on Bird Key to help reduce erosion on the critical bird habitat. The project is funded entirely by the U.S. Army Corps of Engineers and involves placing 1.3 million cubic yards of sand on the beach.
- Status
- Closed
- Sector
- Aerospace & Defense, Government
- Location
- Folly Beach, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- DVIDS
ConstructChat
Ask ConstructChat about Folly Beach Renourishment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Folly Beach Renourishment project aims to renourish Folly Beach for coastal storm damage reduction, dredge the Folly River federal navigation channel, and place material on Bird Key to help reduce erosion on the critical bird habitat. The project is funded entirely by the U.S. Army Corps of Engineers and involves placing 1.3 million cubic yards of sand on the beach. |
Original sector | Coastal |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Folly Beach |
Source
Source | DVIDS |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Government |
Article published date | 2025-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
