Fontibon – Facatativa – Los Alpes
Sector: Road • Location: Colombia
Source: World Bank Group
In April 1995, Instituto Nacional de Vias (INVIAS - Colombia's national road and highway agency) awarded a 20-year concession for the Fontibon – Facatativa – Los Alpes toll-road to the consortium Concesiones CCFC SA. The Fontibon – Facatativa – Los Alpes toll-raod is a 38.3 km long highway that goes from the limits of Fontibon in the bridge over the Bogota river, to Los Alpes going through Facata
- Status
- Prospective
- Sector
- Road, Bridge, Government, Manufacturing (Industrial), Commercial
- Location
- Colombia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Fontibon – Facatativa – Los Alpes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 1995, Instituto Nacional de Vias (INVIAS - Colombia's national road and highway agency) awarded a 20-year concession for the Fontibon – Facatativa – Los Alpes toll-road to the consortium Concesiones CCFC SA. The Fontibon – Facatativa – Los Alpes toll-raod is a 38.3 km long highway that goes from the limits of Fontibon in the bridge over the Bogota river, to Los Alpes going through Facatativa and other municipalities. The consortium is formed by Proyectos de Infraestructura SA – PISA, Colcorp and Concreto. The project reached financial closure in September 2001 with the signing of the modifications to the concession contract. It included the following segments: Tranche I (8,4 Km), Tranche II (6,5 Km), Tranche III (11 Km), and Tranche IV (12,4 Km). In March 2004 the project because opertional. In December 2014, CCFC signed a new contract with the regulatory agency ANI agreeing to invest an additional US$ 93 million (Pesos 186 billion) in construction works in the highway. According to the contract, this road extension was going to be subject to toll charging. http://www.inco.gov.co/concesiones/filtros/fechasimportantes/frm_fechas_importantes.asp?concesion=282 |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Colombia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
